Blog Claims Conflict of Interest in Enbridge Study

Jul 13, 2017
Lead in text: 

"The validity of a high-profile Enbridge Line 5 analysis is being questioned by activist groups after a Canadian blog report alleged the chief engineer for the contractor which performed the analysis was simultaneously working on another project for Enbridge." (MLive)

Source: MLive.com

LANSING, MI -- The validity of a high-profile Enbridge Line 5 analysis is being questioned by activist groups after a Canadian blog report alleged the chief engineer for the contractor which performed the analysis was simultaneously working on another project for Enbridge.

Read more at: MLive.com